WinCC OA engineering

We develop and migrate applications, organise reusable configuration, connect industrial equipment and support testing and commissioning.

On this page

What is WinCC OA?

WinCC OA was formerly called PVSS. ETM was founded in Austria in 1985, Siemens acquired ETM in 2007, and the name changed to WinCC OA in 2010. WinCC OA is a vendor-independent SCADA system and connects to third-party equipment through supported drivers and interfaces.

The architecture supports systems with very large variable counts. Sizing depends on the configured manager set, data retention, interface rates and server infrastructure, and should be verified for the installation.

Source: ETM / WinCC OA company history.

What we do with it

Datapoints, asset types and mass configuration

We define repeated assets such as wellheads once as a datapoint type, then create instances with the same structure. Master datapoints hold shared configuration. We build engineering tools inside WinCC OA so a customer’s own team can add and change equipment without writing code. CTRL scripts handle the application logic behind those tools.

Changes to shared master-datapoint attributes can propagate to linked datapoints while the system is running. Dynamic PowerConfig attributes are set on each datapoint and do not follow the same inheritance rule. We review affected instances and test the selected attributes against the target version before a live change.

Three-layer engineering modelSite-specific engineering sits above reusable engineering components, which are built on the core platform. This is an engineering organisation model, not a runtime dependency diagram.Site-specific buildReusable engineeringCore platform
Site configuration, shared engineering components and core platform.

Reusable libraries hold common symbols, faceplates and application patterns. Site-specific configuration and exceptions remain separate from the shared engineering layer, so teams can trace how an asset is configured.

Consistent panels and alarms

We apply common panel layouts, alarm classes, navigation and trends across related equipment. Shared presentation patterns make equipment states easier to compare while retaining process-specific labels and actions. The project team reviews alarm meaning, priorities and operator response against site procedures.

Shared panels, alarms and navigation. Site-specific names and process exceptions.

Interfaces and control authority

We configure supported drivers for OPC UA, DNP3, Modbus and other interfaces selected for the equipment. Compatibility depends on the device, driver, protocol profile, licence and project configuration. We document and test data quality, communication behaviour and the response to connection failures.

Manager architectureThe Event Manager distributes current data. The other managers are connected schematically to it, not chained together. Data Manager handles stored data, drivers connect equipment, UI presents data, CTRL and API implement logic, DIST connects systems and REDU monitors redundancy. Additional connections are omitted.Event ManagerDriversData ManagerUICTRLAPIDISTREDU
Current-data relationships between managers. History, configuration, peer-system and redundancy connections omitted.

WinCC OA provides an open REST API for configured integration with external applications. Endpoint scope, authentication, access rights, data exposure and operational ownership are defined for the installation.

Control rooms, remote centres and disaster recovery centres use clients connected to the same system data. We engineer control handover between central, remote and local locations on top of WinCC OA user areas and access rights. This is application engineering, not a built-in WinCC OA handover feature. Commands from a location that does not hold control are refused, and every handover is logged. We document and test communication failures and operator indications.

Project-engineered handover using user areas and access rights, with command refusal, logging and tests.

Hot standby and disaster recovery

Hot standby uses a redundant pair for a configured system role. A 2×2 arrangement uses a redundant pair at the main centre and a second redundant pair at the disaster-recovery centre. Distributed-system connections and control logic link the centres; field connections, data synchronisation and failover behaviour depend on the design.

Two centres, two servers per centreA primary server system and a secondary recovery system each contain a hot-standby pair. Distributed-system connections and control logic link the centres. Normally the primary system handles field connections and sends process data to the secondary system.Primary centreServer AServer BHot-standby pairDIST + control logicRecovery centreServer CServer DHot-standby pair
Conceptual 2×2 layout. Separate tested operating rules for primary-centre loss and inter-centre communication loss.

We distinguish loss of the main centre from loss of inter-centre communications. Recovery steps, historical data handling and operator responsibilities are documented and tested for the agreed failure cases.

Insights

WinCC OA questions

What is WinCC OA?

WinCC OA is a SCADA system used to supervise and control industrial processes. Separate software processes, called managers, handle tasks such as equipment connections, current values, data storage and operator interfaces.

What is the background of WinCC OA?

WinCC OA was formerly called PVSS. ETM was founded in Austria in 1985, Siemens acquired ETM in 2007, and the name changed to WinCC OA in 2010. Source: https://www.winccoa.com/company.

Can it work with other vendors’ PLCs?

Yes. WinCC OA can connect to PLCs and equipment from other vendors through configured drivers and interfaces. The right interface depends on the equipment and project requirements.

What does a WinCC OA integrator do?

We develop the application, configure drivers and connect it to PLCs and other systems. We test the operating functions, commission the application on site and provide the configuration records for handover.

How is redundancy handled?

Hot-standby redundancy uses two servers in one system. A 2×2 disaster-recovery arrangement adds a second redundant system at another centre. Distributed-system connections and control logic coordinate the two centres. Failover, loss of communications and recovery must be designed and tested for the project.